Every year 20,000 people cross our Bridge and 1,000 of them depart with new life in Christ!
For this kingdom impact to continue we must reinvest in our facilities.
Below are samples of the modernization projects already underway and in need of funding.
Click here if interested in giving to projects
| |
Main Bridge -
Our main access to camp is over a wooden bridge that spans across
Dutch Bill Creek. This past year we had to replace the rotten boards on the bridge. The
next step is to paint the support structure and beams with a corrosion inhibiter. Without this
bridge there will be no vehicle access.
Cost of Bridge Work: $30,000
|
Hillside -
- is one of our lodge level accommodations.
It sleeps 10 and not only does it include restrooms,
but also a small living room that is sometimes used
as a meeting space. The foundation that
Hillside is sitting on needs to be replaced.
Cost of Foundation: $10,000
|
|
| |
Dining Hall -
Three years ago we did Phase 1 remodel to our dining hall.
Phase 2 remodel projects include: replacing the lights and fixtures,
upgrading the heating system, and installing carpet as a sound barrier.
Lighting: $20,000
Heating: $20,000
Carpeting: $50,000
|
| |
YURT Pineknot Village -
Pine Knot Village is currently a staff house. We have plans to turn this
housing spot into another guest lodging area similar to Yurt Village
that is currently at Ballfield.
By removing the staff house that is currently there,
we have plenty of level land to use. We are going to be constructing
platforms and then installing up-scaled yurts. This yurt village will be
designed to sleep 60.
Electricity and heat must also be added to each yurt to make them
usable year-round for guests.
Cost of Pineknot Village: $100,000
|
|
| |
Playground -
We have a playground available for use right outside the
main office area. We would like to replace the wooden structure with
something more durable that can withstand the elements. We have had
to replace the tire swing numerous times this year alone. We know how
important it is to parents to have a safe place for their kids to play.
Cost of Playground: $95,000
|
Forest Village is home to six of our cabins. Each cabin holds 8 guests and is
home to a community bathroom facility. All the Forest Village
cabins have been painted and were re-floored in recent years.
Rafter and Roof Replacement - We have updated the outside of the cabins,
but now we need to pay attention to the inside structure. The roofs and rafters
on each cabin need to be replaced.
Cost of Replacement: $60,000
|
|
| |
Forest Village Bathrooms -
The bathroom holds 2 showers and 3 toilet stalls on each side. With the
large amount of guests using these facilities, they have gone through much wear and tear. We are
going to remodel them and make them more user friendly.
Cost of Bathroom Remodel: $30,000
|
Pool -
The pool has been around for over 40 years and in that time the
plaster has not been replaced. We need to resurface the pool and create a
new water flow system to automatically fill the pool.
Cost of Resurfacing: $40,000
|
|
| |
Restrooms -
The Tabernacle is centrally located in the camp, however
that means it is also centrally located between, but not close to any, bathrooms.
This causes issues for some groups with the restrooms
being so far away. We want to build restrooms near the Tabernacle
to accommodate these needs.
Cost of Restrooms: $50,000
|